1
|
- Space
- Accessibility
- Maintenance & Energy Efficiency
|
|
2
|
|
|
3
|
|
|
4
|
|
|
5
|
|
|
6
|
|
|
7
|
- Cost: Addition expensive given current 5 level design
- Functionality: Open floor plan not possible with addition option
- Efficiency: Building must be substantially altered to attain cost
efficiencies
- Expansion: limited space if addition built on southern lot
|
|
8
|
- The need to correct the existing library cannot be delayed indefinitely
- A reduced scope would only be a temporary solution
- Doing nothing accomplishes nothing and increases the eventual cost
|